Access the Full Project by Clicking here!
Bidjugde
JOB
Highland Bayou Slope Stability
BID DATE
01/21/21 - 11:00
AGENCY
Galveston County
ESTIMATE
n/a
SCOPE
Re-construction of approximately 1,500 linear feet of the west bank of the Highland Bayou Diversion Canal, between F.M. 2004 and Jay Road Ditch in Hitchcock, Galveston County, Texas. The existing slope is at a gradient of about 3.5H: 1V in order to prevent further slope failures. In addition, the backslope swales (two) situated behind top of slope need to be reconstructed. Interceptor Swale “A” is approximately 700 linear feet and will outfall into Jay Road Ditch. Interceptor Swale “B” is also about 700 feet in length and will outfall into an existing drainage ditch situated between FM 2004 and the south side of Sunrise Creek subdivision. purchasing.bids@co.galveston.tx.us
PREBID
1/5/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT