2021 Treatment Plant Improvements
BID DATE
02/2/21 - 2:00
AGENCY
Napa Sanitation District
ESTIMATE
$770,000
SCOPE
The general scope of work for this project includes replacement of three polymer storage tanks; replacement of concrete tank bases; connection of tanks to existing fill, recirculation, and suction piping; construction of temporary polymer storage tank and associated piping; demolition of existing tanks and concrete bases; concrete coating; and replacement of existing ultrasonic level sensor and transmitter. Also included in the scope of work is the replacement of three 36-inch diameter butterfly diversion valves located within the treatment plant gallery. https://www.napasanplanroom.com/jobs/366/details/2021-treatment-plant-improvements-project-cip-20708 KOno@napasan.com