Access the Full Project by Clicking here!
Bidjugde
JOB
Milford City Culinary Water Improvements 2020
BID DATE
01/21/21 - 10:00
AGENCY
Milford City
ESTIMATE
n/a
SCOPE
A new 600,000 gallon concrete storage tank at the site of the City’s existing tank; modifications and repairs to the existing concrete tank; a new booster pump station and equipment replacing an existing booster pump station; distribution improvements consisting of approximately 900 feet of 8” pipeline, 900 feet of 10” pipeline, 12,000 feet of 12” pipeline, 2,200 feet of 16” pipeline, valve replacements; a new concrete well building; installation of well equipment and controls for a new well at the new well building site; a system wide SCADA system; 3 standby generator systems; modifications to an existing well (equipment and controls); and a new radio read meter system including system software and reading equipment, approximately 700 new radio-read meters, new meter setters. Ben Coray (435) 253-2908 bcoray@sunrise-eng.com
PREBID
1/7/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT