Access the Full Project by Clicking here!
Bidjugde
JOB
Ogden Riverbank Erosion EWP
BID DATE
01/15/21 - 2:00
AGENCY
Ogden
ESTIMATE
$425,000
SCOPE
This Project is for the streambank repair and stabilization for five (5) sites along the Ogden and Weber Rivers, known as the Ogden Riverbank Erosion EWP Project (Project). The purpose of the Project is to: 1. Stabilize the bank and remove debris at Site 1. 2. Stabilize the bank and add engineered riffles for grade control at the Marriott Diversion (Site 2). 3. Stabilize the bank and replace the culvert headwall at the 21st Street Outfall (Site 3). 4. Stabilize the bank at Site 4. 5. Stabilize the bank and relocate the Weber River Parkway Trail at Site 5.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT