Access the Full Project by Clicking here!
Bidjugde
JOB
Lower West Fork Concrete Trail Resurfacing
BID DATE
01/14/21 - 2:00
AGENCY
Tarrant Regional Water District
ESTIMATE
n/a
SCOPE
Trail is to be six inches thick, 11’ wide by 520 LF tapered to existing concrete trail Concrete Material to be 3,000 psi with proper air entrainment: no fly ash Control Joints shall be troweled every 10 feet the entire length of the trail ¾ inch by 6-inch Redwood with ¾ inch void cap shall be used for expansion joints and installed every 110 feet along the trail. Number four (4) rebar with expansion cap shall be used for dowels and placed on twelve (12) inch centers. Grease ½ length of dowel on end with expansion cap. Expansion joint installation will include removal of plastic strip and joints are to be filled with SL1 joint sealant in a limestone color Trail surface shall have a medium broom finish Contractor shall be responsible for final grading and backfill of concrete trail Contractor is responsible for repairing any damage caused to the project or project site during the construction period by the contractor https://www.civcastusa.com/project/5fda599a88629fe2103211bd/summary frank.garcia@trwd.com
UPDATES