Access the Full Project by Clicking here!
Bidjugde
JOB
Fleet Management Parking Lot Reconstruction Phase I
BID DATE
01/28/21 - 2:00
AGENCY
Beaumont
ESTIMATE
n/a
SCOPE
1. Remove concrete and asphalt pavement to limits as shown on the plans or as directed by the Engineer. 2. Remove culverts, junction boxes, and other drainage structures and place new culverts in accordance with the details shown on the plans or as directed by the Engineer. 3. Remove the underground fuel storage tank and relevant piping, wiring, conduit, etc. Furnish and install a new aboveground fuel storage tank with the relevant piping, wiring, conduit, etc. in accordance with the plans or as directed by the Engineer. Remove and replace the existing fuel lines, piping, wiring, conduit, etc. for the existing aboveground fuel tank. 4. Stabilize the natural ground and place new concrete pavement, curb, and driveway in accordance with the details shown on the plans or as directed by the Engineer. 5. Regrade and sod the natural ground to promote positive drainage as shown in the plans or as directed by the Engineer. https://beaumonttexas.gov/wp-content/uploads/pdf/purchasing/bids/bid_opportunities_spreadsheet_web.pdf brandon.belaire@beaumonttexas.gov
UPDATES