North Beach Street Basswood Boulevard Intersection Improvements
BID DATE
01/7/21 - 1:30
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
The major work will consist of the (approximate) following: Removal of 1,804 SF of sidewalk, 7 ADA Ramps, 1,350 SY of concrete pavement; removal of 702 SY of asphalt pavement; removal of 16 trees from the existing medians in Basswood Boulevard; installation of 2,140 feet of electrical conduit for traffic signals, street lights, and ADA crossings; full intersection signal modifications with all related appurtenances; installing 4,260 SY of 11” concrete pavement, 7 ADA Ramps, 1,440 SF of 5♠sidewalk, installing 16 trees; removal and replacement of air relief valve and vault; and reconstruction of water valve vault lid. https://www.fortworthtexas.gov/departments/finance/purchasing/bids/manual-bids/tranp/2020/101582 Iskal.Shrestha@fortworthtexas.gov