Access the Full Project by Clicking here!
Bidjugde
JOB
Natomas Reach D Pumping Plant 4
BID DATE
01/26/21 - 10:00
AGENCY
Department Defense
ESTIMATE
$25,000,000
SCOPE
The work includes relocating Pumping Plant 4 discharge pipes to be raised 10 feet to be above the 200-year water surface elevation and adding a new vault and outfall structure. Additional work includes removal of existing Pumping Plant 4 building and trash rack and reconfiguring the pump station intake and installing a new trash rack. The pump station pad will be raised and have new pumps installed but will not include a new building. A driveway to the new trash rack will also be located adjacent to the Electrical Building, with power provided from the adjacent PG&E lines. Six-foot high chain-link fencing will enclose the Pumping Plant area, with gates installed as shown on the plans. Access ramps and landside toe roads will be reconfigured to accommodate the new pumping plant layout. https://beta.sam.gov/opp/6d0b72a3de7a4b7aabec61b04aa6bbf5/view?keywords=&sort=-modifiedDate&index=opp&is_active=true&page=2&inactive_filter_values=false&opp_publish_date_filter_model=%7B%22timeSpan%22:%227%22%7D&date_filter_index=0¬ice_type=o&pop_state=CA Melissa.a.denigris@usace.army.mil
UPDATES