Access the Full Project by Clicking here!
Bidjugde
JOB
North Texas St Water Main Replacement Overlay East Travis Blvd (REBID)
BID DATE
10/5/21 - 2:15
AGENCY
Fairfield
ESTIMATE
$7,098,000
SCOPE
Lister Construction - $6,426,547 Ghilotti Construction Co. - $6,874,125 A Teichert & Son Teichert Const - $7,196,888 The Project work generally consists of, but are not limited to, the following: abandonment and replacement of existing underground water mains and laterals; installation/replacement of existing water service laterals, meters/boxes and reduced pressure backflow devices; installation of new fire hydrants and gate valves, removal/abandonment of existing hydrants and air release valves and surfaces. Surface improvements include but are not limited to removal/replacement of curbs, gutters, sidewalks, curb ramps, asphalt concrete grind and overlay, pavement striping and markings, traffic detector loops and other work as shown on the Project Plans, as specified in the Contract Documents and as directed by the City Engineer.
UPDATES