Access the Full Project by Clicking here!
Bidjugde
JOB
Recycled Water Distribution Waller Park
BID DATE
02/4/21 - 2:00
AGENCY
Santa Barbara County
ESTIMATE
n/a
SCOPE
The Project consists of the extension of 3.19 miles of 12-inch recycled water distribution pipeline to Waller Park, the installation of a 1-million-gallon holding tank, pump station and control system, and the extension of 1,650 linear feet of 8-inch pipe to connect to the existing park irrigation system in addition to miscellaneous irrigation system changes, signing, marking and labeling. The Project also includes all ancillary stormwater control measures, endangered species mitigation measures, and other work detailed in the Project Drawings and Specifications. Kevin Thompson - 805-803-8756 kethomp@cosbpw.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT