Access the Full Project by Clicking here!
Bidjugde
JOB
Old Chappell Hill Road Improvements
BID DATE
01/19/21 - 2:00
AGENCY
Brenham
ESTIMATE
$773,000
SCOPE
Work consists of reconstructing approximately 1,400 lineal feet of an existing curbed asphalt roadway (Old Chappell Hill Road) to a 40-foot-wide curbed concrete roadway, construction of approximately 840 lineal feet of storm sewer of various sizes ranging from 18-inch to 30-inch, constructing curb inlets and other related storm sewer structures and appurtenances, and constructing an asphaltic concrete roadway connection to FM 577 within TxDOT right of way. https://www.civcastusa.com/project/5fd14e5d08a39a58ec193b30/summary Jared.Engelke@strand.com
PREBID
1/12/2021 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT