Access the Full Project by Clicking here!
Bidjugde
JOB
2014 Pavement Management Program
BID DATE
04/8/14 - 3:00
AGENCY
Brentwood
ESTIMATE
$525,000
SCOPE
Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as 2014 Pavement Management Program (Grind and Overlay), CIP Project No. 336-30834, according to drawings and specifications as prepared by the City of Brentwood and according to the Contract Documents. The work includes grind and overlay, remove and replace and install new asphalt concrete pavement, miscellaneous concrete removal and replacement of curb, gutter and sidewalk, asphalt pathway, traffic striping, signal loops, minor drainage and traffic control, complete and in satisfactory condition, all as shown on the plans and/or as specified herein. Project is to be completed within 45 working days from the date specified in the Notice to Proceed. All signing and striping shall be completed within the 45 working days or liquidated damages will apply. The Contractor shall pay to the City of Brentwood the sum of $750 for each and every calendar day’s delay in finishing the work in excess of the working day completion time, as modified in accordance with the contract documents. dept-engineering@brentwoodca.gov or by calling (925) 516-5420

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT