Access the Full Project by Clicking here!
Bidjugde
JOB
Pole Line Rd Olive Dr Connection Montgomery Wbar Improvements
BID DATE
01/25/21 - 2:00
AGENCY
Davis
ESTIMATE
$4,000,000
SCOPE
This work shall include construction of connection of Olive Drive Pedestrian Bicycke Trail to Pole Line Road Overcrossing Bridge at I-80 and UPRR railroad. The Connection will consist of a linear ramp bridge cast-in-place reinforced-concrete box-girder bridge approximately 14 ft. wide and 408 ft. long. With a longitudinal slope of 8 percent and for the proposed bridge six piles of supporting columns that reach depths between 60 and 80 feet and be approximately 8 by 6 feet square; including all labor, materials, equipment, and incidentals, to completely install an operating facility in accordance with the Project Plans and Specifications. http://www.blueprintexpress.com/davis MMITCHELL@CITYOFDAVIS.ORG
UPDATES