Access the Full Project by Clicking here!
Bidjugde
JOB
Golden State Boulevard Rehabilitation
BID DATE
12/15/20 - 2:00
AGENCY
Turlock
ESTIMATE
$1,085,000
SCOPE
The work consists, in general of: rehabilitation of Golden State Boulevard including, but not limited to, the following: pavement grinding, HMA overlay, traffic control, removal and replacement of curb returns, vertical curb, sidewalk, driveways, and curb and gutter, installation of traffic loop detectors, conduits, and handholes, and replacement striping and signage and other associated work. ahutchings@turlock.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT