Access the Full Project by Clicking here!
Bidjugde
JOB
Glenn Dyer Detention Facility (GDDF) Water Conservation
BID DATE
04/22/14 - 2:00
AGENCY
Alameda County
ESTIMATE
$800,000
SCOPE
The Project consists of: (1) Installation of a New Domestic Water Booster Pump Station (2) Installation of a Temporary Domestic Water Booster Pump Station (3) Retrofit existing Sloan flush and showerhead valves and Acorn lavatory valves with new Sloan electronic valves, utilizing existing toilets. tim.wesig@acgov.org (510) 208-9517

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT