Access the Full Project by Clicking here!
Bidjugde
JOB
Florida Ave Water Repairs
BID DATE
12/10/20 - 1:00
AGENCY
Hemet
ESTIMATE
$150,000
SCOPE
The work generally consists of the partial removal and replacement of an existing 10” ACP water main and related appurtenances/connections as well as the full depth reconstruction of an approximately 2,400 square foot section of existing paved roadway with 6” AC over 10” of base material. The work shall also include traffic control, storm water and erosion control, public notification, and other miscellaneous work, labor, materials, equipment, and transportation necessary for the project as described in these documents. Crystal Robinson 951-765-2348 crobinson@cityofhemet.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT