Matthew Holzapfel Pump Station
BID DATE
12/22/20 - 2:00
AGENCY
Mesquite
ESTIMATE
n/a
SCOPE
New Matthew Holzapfel pump Station with a 10 MGD initial capacity (30 MGD ultimate) and 3.0- million-gallon ground storage tank. The project includes, but is not limited to, the following: sitework, 5,712 s.f. pump station building, 3.0 million gallon prestressed concrete ground storage tank, yard piping, two (2) 3,000 gpm horizontal split case pumps and 300 HP motors, two (2) 750 gpm end suction closed coupled pumps and 75 HP motors, water disinfection system with building, electrical system including a 1,000 kw emergency generator with building, controls, supply meter and vault, and on-site sanitary septic system. jstoker@cityofmesquite.com