Access the Full Project by Clicking here!
Bidjugde
JOB
Hemenway Watershed Phase IIB
BID DATE
01/7/21 - 3:00
AGENCY
Boulder City
ESTIMATE
n/a
SCOPE
This work shall include furnishing all labor, material and equipment to complete the HEMENWAY WATERSHED PHASE IIB, BOULDER CITY PROJECT NO. 09-0785-DR(2) project flood control improvements as described in the specifications and shown in the plans. Work includes, but is not limited to excavation and embankments, removals of existing RCP, CMP, and other miscellaneous items. Installation of RCP, RCB, rip-rap (grouted and non-grouted), drop inlets and storm drain manholes, grated inlets, concrete channel and channel walls, concrete flatwork, Type II aggregate base, asphalt pavement, rail fencing and guardrail, signage, project signs and other miscellaneous items. psikora@bcnv.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT