Macdonald Avenue 33rd Street Intersection
BID DATE
01/21/21 - 2:00
AGENCY
Richmond
ESTIMATE
$627,800
SCOPE
In general, the work to be performed under these specifications consists of upgrading the traffic signal system at the intersection of 33rd Street and Macdonald Avenue in Richmond, California. The work to be performed includes, but is not limited to, providing traffic control during the construction period, clearing, grubbing, and environmental protection, removal and replacement of concrete flatwork, curb and gutter, and AC, installation of sidewalk, curb ramp, curb and gutter and asphalt plug, adjustment of underground utility surface features, installation of RCP pipe, a drop inlet, and a channel drain with inlet/outlet, minor traffic striping, and installation of an updated traffic signal system Tawfic Halaby - 510-621-1612 tawfic_halaby@ci.richmond.ca.us