Access the Full Project by Clicking here!
Bidjugde
JOB
Creekview Lift Station Force Main Sanitary Sewer Improvements
BID DATE
12/10/20 - 2:00
AGENCY
Northampton Municipal Utility District
ESTIMATE
$1,573,000
SCOPE
The work consists of providing the necessary labor materials, equipment, and supervision to construct Creekview Lift Station, Force Main, & Sanitary Sewer Improvements, including, but not limited to construction of a twelve-foot (12') diameter concrete wet well including 100% solids epoxy coating, complete with three (3) submersible pumps, riser piping, valve vault, valves, coatings, chain-link fence and gates, site work, grading, concrete access drive, concrete pavement, fabricated elevated hot dipped galvanized steel walkway and stairs complete aluminum handrails with and aluminum kickplate, two (2) onsite manholes, 24” PVC sanitary sewer, 24” DI sanitary sewer, 10” DI onsite force main, 10” PVC onsite force main, one (1) 50-kW natural gas driven generator, sound attenuated weatherproof level 2 enclosure, service rack, lift station control panel, automatic transfer switch, electrical conduit and wiring, load bank testing, electrical service, disconnect switches, and all else as shown the construction drawings and detailed in the specifications for a fully functioning facility. https://www.civcastusa.com/project/5fac03b0ae3e1b274db3e0c5/summary rwatkins@jonescarter.com
PREBID
11/24/2020 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT