Wastewater Treatment Facility Expansion 2 4 MGD
BID DATE
01/14/21 - 4:00
AGENCY
Porter Municipal Utility District
ESTIMATE
n/a
SCOPE
The Project consists of constructing a wastewater treatment plant expansion including a drain pump station, an elevated headworks with a mechanical fine screen, three (3) aeration basins with fine bubble diffusers, two (2) secondary clarifiers with a sludge pumping system, and four (4) aerobic digesters, two (2) chlorine contact basins, a CMU building for the motor control center and positive displacement blowers, a CMU building for the chemical storage and feed, and a natural gas emergency generator. The scope also includes site work, site grading, storm sewer, plant piping, modifications to existing force mains, protective coatings, paving, electrical duct banks, conduit, wiring, controls, and integration (Key Map No. 296-P). https://www.civcastusa.com/project/5f934e553a1f64ffaa2f7a9a/summary dkd@as-engineers.com