Highway 84 Corridor Val Verde 16 inch Water Line Extension
BID DATE
12/17/20 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project generally consist of the furnishing of all labor, materials, equipment, appurtenances and incidentals as required to properly design, fabricate, construct and test the construction items required for the construction of a 16-inch waterline to the West End at Val Verde Development. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein. https://www.civcastusa.com/project/5fbbf30542b0d1fad6c9b93e/summary victorv@wacotx.gov
PREBID
12/2/2020 9:15

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT