Access the Full Project by Clicking here!
Bidjugde
JOB
Water Main Replacements
BID DATE
04/23/14 - 8:00
AGENCY
Lake Havasu
ESTIMATE
$1,250,000
SCOPE
The Master Plan Update identified select areas with small diameter pipe that were necessary for upgrades for purposes of ultimate build out. The small diameter pipelines have also experience high pressures and have had multiple breaks within the past few years. Additionally there are some 6- inch lines that have been experiencing frequent breaks as well. Currently, small diameters include select areas with 4-inch lines many in cul-de-sacs. Operations staff has identified 10,000 LF of pipeline that they would like designed so that a combination of bidding and construction by operations staff can be utilized to upsize and address breakages that are occurring.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT