Access the Full Project by Clicking here!
Bidjugde
JOB
Lift Station No 13 Rehabilitation SJRA Woodlands Division
BID DATE
12/7/20 - 1:00
AGENCY
Wylie
ESTIMATE
n/a
SCOPE
Work of the contract is for the construction of Lift Station No. 13 Rehabilitation, including but not limited converting the existing dry pit/wet well set up to a submersible pump layout, the replacement or relocation of the lift station electrical equipment as indicated in the contract documents, the replacement of the existing wet well top slab, the replacement of the associated piping, mechanical, and electrical items, and related site work. Construction will also include establishing temporary diversion pumping and constructing permanent diversion pumping connections, tree protection, coordination with the Woodlands Township, constructing concrete driveway, raising the electrical controls via a permanent platform, installation of a natural-gas generator, associated site grading, off-site grading, constructing a grass swale, and constructing a concrete swale with riprap to provide positive drainage as specified in the contract documents. krobbins@sjra.net
PREBID
12/1/2020 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT