Access the Full Project by Clicking here!
Bidjugde
JOB
FY19 Street Reconstruction Harwood Road South Pipeline Road Highland Drive
BID DATE
12/16/20 - 2:00
AGENCY
Euless
ESTIMATE
n/a
SCOPE
VOLUME I – HARWOOD ROAD RECONSTRUCTION This project includes: demolition of approximately 4,900 centerline linear feet of existing roadway, incidental driveway and side street connections, and right of way clearing and the subsequent construction of approximately 32,200 SY of reinforced concrete pavement, 2,600 SY of asphalt transitions, 27,000 SF of reinforced concrete sidewalk, 6,300 LF 8-inch Water Line, 550 LF 8-inch Sanitary Sewer Line, Pavement Markings and Signage and incidental adjustments to irrigation, drainage, signal, sign, water, sewer, and other various appurtenances. VOLUME II – SOUTH PIPELINE ROAD AND HIGHLAND DRIVE RECONSTRUCTION The project includes: demolition of approximately 6,800 centerline linear feet of existing roadway, incidental driveway and side street connections, and right of way clearing and the subsequent construction of approximately 24,000 SY of reinforced concrete pavement, 1,000 SY of asphalt, 11,400 SF of reinforced concrete sidewalk, 28,800 SF concrete trail, 3,200 LF 12-inch to 48-inch RCP Storm Drain Line, 1,500 LF 8-inch Water Line, 2,500 LF 8-inch Sanitary Sewer Line, Pavement Markings and Signage and incidental adjustments to irrigation, sign, water, sewer, and other various appurtenances. https://www.civcastusa.com/project/5fb42e56d254964ad6abd2eb/summary mljones@eulesstx.gov
PREBID
12/9/2020 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT