Federal 19th St BART Lake Merritt Urban Greenway
BID DATE
12/17/20 - 3:00
AGENCY
Oakland
ESTIMATE
$5,625,158
SCOPE
In Downtown Oakland, on Thomas L. Berkley Way (20th Street) between Broadway and Harrison Street, design and construction of infrastructure improvements for the pedestrian bicycle rider environment. Pedestrian features include sidewalk reconfiguration and widening, curb extensions, ADA compliant curb ramps, pedestrian median refuges, and crosswalk realignment. Bicycle features include the use of bike lanes between Thomas L. Berkley Way (20th Street) and Harrison Street. Additional components include lane reduction and geometric alignment, traffic signal modifications, street and safety lighting improvements, signing and striping, utility relocation, and landscaping features in the median and sidewalk. A pre-project meeting is scheduled for Nov 17, 2020 - 2:30 pm esiu@oaklandca.gov
UPDATES