Access the Full Project by Clicking here!
Bidjugde
JOB
Sacramento River East Levee Contract 2
BID DATE
12/15/20 - 10:00
AGENCY
Department Army
ESTIMATE
$50,000,000
SCOPE
The scope of work for Sacramento River East Levee (SREL) Contract 2 is construction of approximately 1.8 miles of varying types of seepage cutoff walls including open trench Soil-Bentonite (SB) and Slag Cement-Cement-Bentonite (SCCB) Cutoff Walls, Deep Mix Method (DMM) Cutoff Walls, and Jet Grout Cutoff walls. Construction of the cutoff walls is along discontinuous reaches of SREL within the Miller Park, Little Pocket, and Big Pocket areas of Sacramento, CA. The scope also includes relocation and removal of multiple utilities within the work areas, working adjacent to an active railroad line, modification of existing relief wells, removal and replacement of City of Sacramento Sump 63 in the Big Pocket, and removal, handling, and disposal of contaminated soils. Night work is permitted for construction of Jet Grout cutoff walls only. All work is required to be completed No Later Than (NLT) December 2021 with the levee reconstruction completed NLT 30 September 2021. Multiple concurrent efforts will be required to complete work within the given period of performance. https://beta.sam.gov/opp/1ab2c3c1526048fabf5b961f3dd14986/view?index=opp&page=1&keywords=&inactive_filter_values=false&opp_publish_date_filter_model=%7B%22timeSpan%22:%227%22%7D&date_filter_index=0¬ice_type=o&pop_state=CA DeAnna L. Mannel deanna.l.mannel@usace.army.mil Phone Number9165576690 Secondary Point of Contact Melissa A. DeNigris Melissa.A.DeNigris@usace.army.mil Phone Number9165575137
UPDATES