Access the Full Project by Clicking here!
Bidjugde
JOB
Miscellaneous Pipeline Replacements Phase I
BID DATE
11/24/20 - 11:00
AGENCY
Las Vegas VWD
ESTIMATE
$2,753,713
SCOPE
The Sites of the Work are located on Atlantic Street (CLV jurisdiction) between St Louis Avenue and Oakey Boulevard, Bourbon Way (CLV jurisdiction) between Torrey Pines Drive and Salem Drive, and Cameron Street (Clark County jurisdiction) between Tropicana Avenue and Quality Court. The Work on Atlantic Street consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,600 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two 2-inch backflow prevention devices, three new fire hydrant assemblies, and all other work as required by the contract documents. The Work on Bourbon Way consists of abandoning in place the existing 6-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 1,580 LF of new 8-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. The Work also includes installation of two new fire hydrant assemblies, and all other work as required by the contract documents. The Work on Cameron Street consists of abandoning in place the existing 10-inch ACP pipeline, fittings, valves and other appurtenances within the limits defined in the construction drawings and replacing it with approximately 2,030 LF of new 10-inch PVC or DIP pipe, fittings, valves and associated appurtenances needed to re-establish lateral connections to existing laterals. Of the 2,030 LF, approximately 490 LF shall be concrete encased and approximately 90 LF shall be installed trenchless technology. The Work also includes installation of four new fire hydrant assemblies, and all other work as required by the contract documents. Purchasing.HelpDesk@lvvwd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT