Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) 2021 Effluent Export Pipeline Pond Lining
BID DATE
05/10/21 - 5:00
AGENCY
Incline Village GID
ESTIMATE
$20,000,000
SCOPE
The District’s 2021 Effluent Export Pipeline and Pond Lining Project, using Construction Manager At Risk (CMAR) delivery, includes the components to store and transport wastewater effluent from the Water Resource Recovery Facility (WRRF) in Incline Village to the disposal facility 21 miles away in Douglas County.The effluent pipeline is a 16-inch steel pipeline located in Nevada Department of Transportation (NDOT) State Route 28, constructed in 1970 and in need of repair, rehabilitation or replacement. The priority pipeline segments are located in the Lake Tahoe Basin and specifically include the 12,385 feet of pipe labeled Segment 3 and the 17,314 feet of pipe labeled as Segment 2. The District is considering in-situ rehabilitation methods such as slip-lining, cast-in-place pipe and pipe-bursting. This pressure pipe has static pressure from 150 to 380 psi.The Pond Lining Project is to line an existing 2.4-million-gallon unlined storage pond constructed in 1962 and associated pumping structures located at the WRRF at 1250 Sweetwater Road that could be utilized for effluent storage to meet Nevada Division of Environmental Protection (NDEP) requirements. Ronnie Rector - 775-832-1267 rlr@ivgid.org
UPDATES