Water Reclamation Plant No 10 T 1 Pump Station Replacement Pump
BID DATE
01/13/21 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$21,000,000
SCOPE
The work shall consist of demolition of existing T-1 Pump Station and existing Plant Water Pump Gallery facilities and furnishing of all labor, materials, equipment, and appurtenances necessary for the complete and satisfactory construction of the T 1 Pump Station, Equalization Basin No. 2, and the T-2 Pump Station Modifications including, but not limited to, the following components:1. Site Work (Grading, Retaining and Sound Walls, Paving, and Drainage Facilities)2. Site Piping and Electrical3. SCE Electrical Service Facilities4. Pump Structure5. Surge Tanks6. Junction Structure7. MCC Building8. Electrical Switchgear, VFDs, Control Panels, and RTU Panel9. Vertical Turbine Pumping Units10. Above grade Piping, Valves, and Appurtenances11. Instrumentation Jignesh Ladhawala - 760-398-2661 Jladhawala@cvwd.org