6 5 MG Reservoir 4606 2 Construction Mission Hills Zone
BID DATE
11/19/20 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$4,500,000
SCOPE
This project includes constructing a 6.5 MG above-ground steel domestic water storage tank on an existing CVWD tank site located at 72070 Vista Chino Drive at the intersection of Rio Del Sol Road and Vista Chino Drive in an unincorporated area of Riverside County known as Thousand Palms.Reservoir Site Work: The reservoir site work shall consist of all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facility); earthwork and site work including excavating, importing, exporting, trenching, scarifying, backfilling, placing, filling, compacting, and grading all soil and rock materials onsite; restoring all areas not intended to be altered to preconstruction conditions (inside and outside project limits); transporting offsite all vegetation and deleterious material; furnishing and installing site piping and all related work; leakage and pressure testing pipelines; protecting in place or removing and replacing all existing utilities and public and private improvements; constructing storm drains, V-ditches, drainage swales, concrete inlets and outlets, rock rip-rap, and all drainage facilities; furnishing and installing crushed miscellaneous base; furnishing and installing site fencing, gates, and appurtenances; furnishing and installing all electrical service equipment, electrical panels, instrumentation and controls, lighting, conduit, and conductors; and all related work.Reservoir Work: The reservoir work shall consist of furnishing and erecting one (1) new 6.5 MG welded steel potable water storage reservoir with appurtenances; furnishing all design calculations and fabrication drawings; furnishing and installing protective coatings on all interior and exterior surfaces of the reservoir, including piping, appurtenances, and miscellaneous metal; shop and field testing; constructing reinforced concrete ringwall and related asphalt sand and clean sand foundation beneath reservoir; furnishing and installing reservoir inlet and outlet piping; furnishing and installing reservoir drain and overflow piping; leakage and pressure testing pipelines; and all related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT