El Camino Real at Don Juan Avenue Retaining Wall
BID DATE
04/3/14 - 2:00
AGENCY
San Juan Capistrano
ESTIMATE
$373,405
SCOPE
The work to be done consist of constructing a precast modular block gravity retaining wall along the westerly slope of El Camino Real between the ingress and egress driveways of the Capistrano Unified School District facility located at 31422 Camino Capistrano, and establishing a landscaped parkway along the west side of El Camino Real within the prescribed project limits. The work will include, but not limited to, any public notification, utility coordination, protection of existing facilities, miscellaneous area clearing and grubbing, tree removals, surveying, trench excavation and backfilling, site preparation and grading, preparing foundation soil, preparing the back-cut conditions, furnishing and installing leveling pad and backfill to the lines and grades shown on the construction drawings, furnishing and installing foundation drain, sub-drain and other wall-related drainage systems, connection to existing water facilities, miscellaneous asphalt and concrete work, landscaping and irrigation installation, implementing site best management practice (BMPs) for erosion and sedimentation control, public safety, traffic control / warning devices, and all other appurtenant work necessary to construct the improvements as shown on Contract Plans.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT