Las Vegas Blvd Roadway Improvements I 215 South Russell Rd
BID DATE
12/8/20 - 2:15
AGENCY
Clark County
ESTIMATE
n/a
SCOPE
The Work to be performed under this Contract is for the construction of roadway, utility, and miscellaneous improvements to Las Vegas Boulevard from l-215S to Russell Road (Phase B) in Clark County, Nevada. The Work will generally consist of improvements on Las Vegas Boulevard from 1-215 South to approximately 500 feet north of Russell Road, a length of approximately 1.75 miles. The project includes cold planing, plantmix bituminous surface, UTACS, pedestrian protection device installation, curb and gutter reconstruction, sidewalk, sidewalk reconstruction/ widening, sidewalk ramps, median reconstruction, bus turnouts, street lights and Smart poles, LED landscape lighting conversion, landscaping/irrigation modifications, traffic signal modifications, utility adjustments, storm sewer systems, open trench and trenchless sanitary sewer system, Fire Station 11 septic tank and leach field abandonment, pavement markings, signing, sign bridge, power and communication system installation and connection to new Smart poles. The Project also includes the reconfiguration of the Las Vegas Boulevard/Russell Road intersection, widen pedestrian queuing areas, and install a new traffic signal system. In addition, the traffic signal system will be replaced at the emergency signal at the fire station and the pedestrian crossing at the "Welcome to Las Vegas" sign, and detector loop installation at signalized intersections. The work also consists of miscellaneous removal and disposal and removal and salvage/ replacement of designated items, traffic control, dust control, quality control, and other related items of work as specified and shown on the Drawings. This work also includes a new waterline the entire project length to replace an existing waterline for the Las Vegas Valley Water District and the special provisions therefor are incorporated into the specifications. Improvement plans were prepared by Kimley­ Horn & Associates, are entitled "Contract No. C1497, Las Vegas Boulevard Waterline Replacement from 1-215 to Dewey Drive," and are attached to this plan set. The work to be performed under this Contract also includes the Intersection Improvements from Sands Avenue at Las Vegas Boulevard to Koval Lane. The work will include traffic signal modification at Las Vegas Boulevard and Spring Mountain/Sands and at Sand Avenue and Palazzo/Wynn, installing LED street lighting along Sands Avenue east of Palazzo/Wynn to Koval Lane, installing ITS conduits and fiber optic cable, pavement, constructing drop inlet, manholes, and drain pipe, curb and gutter, concrete sidewalk, concrete sidewalk ramps, concrete tack-on islands, and removing and installing permanent signs and pavement markings. scott.jones@clarkcountynv.gov
UPDATES