Access the Full Project by Clicking here!
Bidjugde
JOB
Brea Water Main Replacement Steele Dr Tact Pleasant Hills Tract
BID DATE
11/18/20 - 2:00
AGENCY
Brea
ESTIMATE
$3,900,000
SCOPE
The work to be constructed hereunder consists of replacing approximately 11,840 linear feet of existing water mains with PVC C900 and the rehabilitation of the residential streets in the Steele Drive and Pleasant Hills Tract. The Project also to include the removal and replacement of existing damaged sidewalk, concrete curb and gutter, curb ramps and AC pavement, along with the adjustment of existing utilities facilities to grade, construction survey, survey monument restoration, traffic signage and striping, temporary traffic control, and all other miscellaneous improvements required to complete the Project as shown on the Plans, and as included in these Specifications. A pre-project meeting is scheduled for Nov 5, 2020 - 10:30 am
PREBID
11/5/2020 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT