Silver Creek Secret Pass Wash Flood Erosion Mitigation
BID DATE
12/2/20 - 3:00
AGENCY
Bullhead
ESTIMATE
n/a
SCOPE
The Project consists of the construction of approximately 1,600 linear feet of containment dikes near the inlet locations of two existing roadway culvert crossings beneath Bullhead Parkway, for Silver Creek and Secret Pass Wash. The flood flow containment dikes will be protected from erosion using cement-stabilized alluvium (CSA), elevated to the 100-year water surface profile plus freeboard, and toed-down to scour depths. Susan Carroll (928) 763-9400 ext 500 scarroll@bullheadcity.com