Access the Full Project by Clicking here!
Bidjugde
JOB
2020 Pavement Rehabilitation
BID DATE
10/9/20 - 12:00
AGENCY
San Carlos
ESTIMATE
$2,500,000
SCOPE
The scope of work generally includes mobilization, traffic control, water pollution control, dust prevention and control, site cleanup, asphalt concrete grinding/removal, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, utility cover lowering & restoring to grade, loop detector replacement, striping removal & replacement and all other work as shown on the Plans and as called for in the Technical Provisions and as directed by the Engineer.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT