Bidjugde
JOB
TMWRF TRI Effluent Pump Station
BID DATE
11/4/20 - 2:00
AGENCY
Truckee Meadows Water Authority
ESTIMATE
$5,500,000
SCOPE
Project shall include the construction of a block building within an existing municipal water treatment plant to house five vertical turbine pumps that will comprise an effluent pumping station. The pump station will include installation approximately 145 feet of 36-inch diameter ductile iron piping and 88 feet of 18-inch pipe. The pumps will discharge to a common ductile iron pipe header within the building. The pumping system will include an air-over-water surge tank system. Construction will include all electrical cabinets, wiring, lights, motor starters and controls as well as HVAC. The work will include selective demolition of existing utility infrastructure, relocation and reconnection of utility lines. The work will include the construction of approximately 900 feet of 24-inch fully restrained ductile iron pipe. http://www.farrwestengineering.com/bid-room/

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT