TMWRF Effluent Water Main
BID DATE
11/5/20 - 2:00
AGENCY
Truckee Meadows Water Authority
ESTIMATE
$34,000,000
SCOPE
Project consists of installation of approximately 16 miles of 24-inch diameter ductile iron effluent water main. Effluent main originates at the Truckee Meadows Water Reclamation Facility (TMWRF) and ends east at the Tahoe-Reno Industrial Reservoir (TRI Reservoir) [Schedule A]. In addition, the Project consist of equipping two induction wells located in the TRI Center near the TRI GID sewer plant and 2.4 miles of 14-inch HDPE pipeline originating at the wells and ending at the TRI Reservoir [Schedule B]. The Project components includes mass grading, 24” Ductile Iron pipeline system, 500,000-gallon tank, rock excavation, rock blasting, storm drain culverts, jack and bore, microtunneling, control vaults, electrical improvements, induction well equipping, 14” HDPE raw water pipeline system, asphalt pavement, gravel restoration and hydroseeding. http://www.farrwestengineering.com/bid-room/

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT