Access the Full Project by Clicking here!
Bidjugde
JOB
Check Structure MP 88 6 Replacement
BID DATE
10/28/20 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$3,000,000
SCOPE
The work shall consist of demolition of existing check structure at Milepost 88.6, and construction of new check structure; constructing a canal bypass with concrete lining; constructing earthen cofferdams; forming and placing of reinforced concrete for slabs, walls and decks for the check structure; installing two (2) radial gates with actuator pulley’s furnished by CVWD; miscellaneous metalwork; electrical, instrumentation and control work; grading and site work; and CCTV security camera system installation. Brian Korcok - 760-398-2661 BKorcok@cvwd.org
PREBID
10/13/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT