Access the Full Project by Clicking here!
Bidjugde
JOB
Overhill Road Vicinity Main Replacement
BID DATE
11/10/20 - 10:00
AGENCY
Contra Costa WD
ESTIMATE
n/a
SCOPE
The Work includes, but is not limited to, mobilization and demobilization, locating District facilities to satisfy the District’s USA North (811) obligations, the installation of approximately 3.5 Miles of 6-inch and 8-inch diameter polyvinyl chloride (PVC) and ductile iron (DI) water mains and appurtenances, abandonment in place of existing mains and appurtenances, transporting of materials, on-site storage, excavation, sheeting, shoring, bracing, draining, collection and disposal of all treated water contained within the existing pipes and all water used to flush new installed pipes, disposal of any ground water encountered to the local storm drain. Sean Maurel: smaurel@ccwater.com and/or bidcoordinator@ccwater.com
PREBID
10/22/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT