Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Street Maintenance Program 2021 2022 2023
BID DATE
05/26/21 - 10:00
AGENCY
Flagstaff
ESTIMATE
$6,000,000
SCOPE
CONTRACTORS SUBMITTED: C AND E; COMBS; RTR PAVING. The Street Maintenance Program includes street overlay, chip seal, micro seal and crack sealing construction to preserve and maintain existing asphalt street and parking lot pavements. The contract work also includes removal and replacement of curb returns and sidewalks at many locations on the streets overlaid to bring these streets into compliance with the Americans with Disabilities Act (“ADA”). Traffic signal detection modifications may be required where the work disturbs existing detection equipment. Utility adjustments and pavement marking are also included in the work.The overlay streets are selected after evaluation of the street condition using pavement management software owned by the Owner. One half of the City street pavements are evaluated and ranked each year. Each street pavement is assigned an overall condition index (“OCI”) based on the type and severity of the distress observed. A pavement that has no distress is given an OCI of 100. Each pavement distress such as cracking or roughness reduces the street’s OCI. The street pavements are ranked by OCI and the pavements exhibiting the most severe distress are programmed for resurfacing with asphaltic concrete overlays as budget allows. Matthew Luhman CPP, CPPB - 928-213-2278 mluhman@flagstaffaz.gov
UPDATES