Skinner 1 Lift Station Replacement
BID DATE
10/27/20 - 5:00
AGENCY
Eastern Municipal WD
ESTIMATE
$975,000
SCOPE
The work comprises construction of a submersible lift station with two submersible pumping units; electrical power and control equipment; site work including construction of a driveway and retaining walls; construction of an 8" gravity sewer connection; construction of a 4" sewage force main connection; demolition and abandonment of the existing Skinner 1 Lift Station; construction of an outdoor standby power diesel engine generator set for the new Skinner 1 Lift Station and existing Skinner 4 Lift Station; installation of an automatic transfer switch and associated electrical panels; construction of an electrical panel sunshade structure, and associated reinforced concrete foundation; installation of conduit, conductors, and appurtenances; and modification of existing equipment to accommodate the proposed electrical improvements. eichpera@emwd.org
PREBID
10/6/2020 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT