Access the Full Project by Clicking here!
Bidjugde
JOB
Arterial Streets Maintenance Trautwein Road Cole Avenue
BID DATE
04/10/14 - 10:00
AGENCY
Riverside
ESTIMATE
$3,311,505
SCOPE
The project entails maintenance improvements on Trautwein Road (Alessandro Boulevard to Van Buren Boulevard), Cole Avenue (Van Buren Boulevard to Krameria Avenue), California Avenue (Tyler Street to Van Buren Boulevard), and Central Avenue (Canyon Crest Drive to Canyon Creek Drive). This project generally includes, but is not limited to, the reconstruction of asphalt pavement, concrete sidewalks, driveways, bus pads, wheelchair ramps, curb and gutter; adjustment of water meters boxes, water valve covers, and sewer, storm drain, and electric manholes; replacement of traffic loops and striping; and installation of signs. In regards to asphalt pavement preservation and maintenance, the project requires the contractor to use crack seal, crack repair, and slurry seal where indicated. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a uniform mill, replace the existing asphalt, and an ARHM overlay where indicated.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT