Access the Full Project by Clicking here!
Bidjugde
JOB
Dunphy Park Soil Stockpile Removal (REBID)
BID DATE
04/30/21 - 2:00
AGENCY
Sausalito
ESTIMATE
$800,000
SCOPE
Silicon Valley Paving - $340,200 Innovative Construction Solutions - $738,346 Eleven Engineering - $750,055 Pacific States Environmental - $828,550 Brannon - $949,790 Remediation Risk Management - $957,497 The Project is located east of Bridgeway, between Litho St. and Locust St. and is described as follows: Work shall include removal and disposal of stockpiled contaminated soil in accordance with all applicable local, state and federal laws and regulations. The successful bidder must be capable of assembling, directing, and managing a workforce that can successfully complete the removal and disposal operations within 40 calendar days. All soil should be assumed as contaminated with hazardous material per the testing results included in the appendix of these contract documents. Work shall include all necessary measures to safely transport and dispose of material including erosion control and washing of equipment before it leaves the site. mlockett@sausalito.gov
UPDATES