Access the Full Project by Clicking here!
Bidjugde
JOB
Johnson Well No. 4 Equipping
BID DATE
04/9/14 - 2:00
AGENCY
Riverside
ESTIMATE
$796,000
SCOPE
The work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to equip Johnson Well No. 4 complete in place in accordance with the Plans and Specifications. The project involves the construction of an irrigation waterline and appurtenances consisting of approximately, 650 linear feet of 16-inch Ductile Iron Pipe, refurbishing the existing well casing, installing a temporary pump and redevelop and test pump the well, and furnishing and installing a complete pumping unit, piping, electrical, fencing and shade structure for a fully operational well as awarded by the City under Bid Schedule "A". Production is expected to be 2,500 gpm continuous. Job Location. The project is located approximately 100 feet east of the Warm Creek Chanel and 150 feet south of Fairway Drive within the City of Colton as shown on Drawing D5-1115202. 2-1.1.2 Kevin Munns (951)826-5820

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT