Access the Full Project by Clicking here!
Bidjugde
JOB
Fern Avenue & San Timoteo Canyon Road Water Pipeline Replacement
BID DATE
04/3/14 - 2:00
AGENCY
Redlands
ESTIMATE
$400,000
SCOPE
Replacement of water pipelines and appurtenances along Fern Avenue and San Timoteo Canyon Road. The scope of work for this project is the installation of 12” pipeline and 8" pipeline. The work shall consist of all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork (including trenching, shoring, sloping, bedding, and backfilling including select imported material or select native material); compacting; furnishing and installing all pipe, fittings, and appurtenances; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Jason Montgomery City of Redlands PO Box 3005 35 Cajon St Redlands, CA 923731505 Tel:(909) 798-7584 x5 Fax:(619) 688-0585 jmontgomery@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT