Alma Street Oregon Expressway Overpass Storm Drain Culvert
BID DATE
10/14/20 - 3:00
AGENCY
Palo Alto
ESTIMATE
$223,100
SCOPE
The Oregon Expressway six-feet by six-feet concrete box culvert is an elevated storm drain structure that carries water parallel to Alma Street across Oregon Expressway.The box culvert is a two span structure over the roadway on Oregon Expressway with a center pier in the median. Leaks were detected along both sides of the box culvert by a residence in December, 2016 . City maintenance crew noted few small cracks along the length of the exposed box culvert. Mark Thomas, a structural consultant was hired by the City to inspect the cracks and provide recommendations to the City to fix the cracks and prevent leakage. Greg Pustelnik - 650-617-3167 Greg.Pustelnik@CityofPaloAlto.org