Access the Full Project by Clicking here!
Bidjugde
JOB
Sunrise Park Storm Drain
BID DATE
10/7/20 - 5:00
AGENCY
South Jordan
ESTIMATE
n/a
SCOPE
The work is located at approximately 11259 S Topview Road and generally includes, but it is not limited to Constructing an Open Channel and Furnishing and Installation of a 30” Storm Drain Pipe; Traffic Control and Surveying Staking; Material Testing and Quality Control; Potholing to Determine Existing Utilities’ Locations; Earthwork; Demolition, Removal and Disposal of Existing Storm Drain Pipe; Abandoning Existing Pipe in the Drainage Basin; Furnishing and Installation of Manholes; Construction of Concrete Flare End Sections; Furnishing and Installation of Trash Racks; Excavation and Disposal of Excess Material; Landscape Restoration; Asphalt Trail Restoration; Concrete Sidewalk Restoration; Furnishing and Installation of all Materials; All Labor; Supplies; Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Mobilization and all other Costs including Overhead and Profit necessary to complete job based on construction plans per APWA standards and City requirements. https://solutions.sciquest.com/apps/Router/SourcingResponseSummary?EventId=908283&SupplierId=17322236&tmstmp=1600365857074 Cindy Felt +1 801-254-3742 ext. 1397 cfelt@sjc.utah.gov
UPDATES