Access the Full Project by Clicking here!
Bidjugde
JOB
Miscellaneous Pipeline Replacements Phase II
BID DATE
10/13/20 - 11:00
AGENCY
Las Vegas VWD
ESTIMATE
$2,071,616
SCOPE
The Work is located within the existing right-of-way of Decatur Boulevard beginning at the intersection of Charleston Boulevard and ending at the intersection of Alta Drive; and is within the right-of-way Warm Springs Road beginning at the intersection of Caliente Street and ending at the intersection of Spencer Street. Work in Decatur Boulevard consists of abandoning approximately 2,800 linear feet of existing 12-inch asbestos cement pipe (ACP), and replacing it with approximately 2,900 linear feet of new 12-inch pipe (DI or PVC). Additionally, there is approximately 90 linear feet of existing 8-inch ACP in Decatur Boulevard connecting Alpine Way which will be abandoned and replaced with approximately 55 linear feet of new 8-inch pipe (DI or PVC). Work in Warm Springs Road consists of abandoning approximately 600 linear feet of existing 12-inch ACP and replacing it with 660 linear feet of new 12-inch pipe (DI or PVC). This project also includes, but is not limited to removal, abandonment, and/or installation of backflow devices, blow-off assembly appurtenances, gate valves, fire hydrants, service laterals, meter boxes, and other appurtenances as shown on the drawings. Work will also include pavement, sidewalk, and median islands restoration of the sites to existing conditions. Purchasing.HelpDesk@lvvwd.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT