Oasis In Lieu Recharge Phase II
BID DATE
10/28/20 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$50,000,000
SCOPE
The Project consists of the items set forth below and related facilities.1. Construction of approximately 17 miles of pipeline and underground facilities including all ancillary excavation, rock removal, trenching, shoring, dewatering, surface restoration; installation of turnout meters; connections to existing pipelines;and other items of construction to complete the project. The project consists of over five (5) miles of pipelines varying in diameters from 36 inches to 60 inches and approximately twelve (12) miles of pipelines below 36 inches in diameter.2. Construction of four (4) pump stations, including but not limited to, furnishing and installing vertical turbine pumps, complete with motor drivers and accessories; steel manifold and discharge piping, complete with associated valves, couplings, magnetic flowmeter, and all appurtenances; surge control systems; and all electrical and control equipment, including electrical control devices, conduit, wiring, motor control center, and termination to all electrical and control devices. Construction of the pump stations also includes site grading, aggregate base surfacing, and furnishing and installing chain link fencing.3. Construction of four (4) reservoirs including all ancillary excavation, rock removal, materials handling and hauling, embankment construction, trimming of earth foundations, furnishing and placing geotextile fabric, geomembrane lining, and unreinforced concrete lining; site grading; aggregate base surfacing; furnishing and installing chain link fencing; and all electrical and control equipment, including electrical control devices, conduit, wiring, and termination to all electrical andcontrol devices. Erica Fieger - 760-398-2651 x3422 efieger@cvwd.org
UPDATES